
How many PJM capacity emergency days will there be in 2026?
K 277.6K contracts
1
4

- Reported volume
- K 277.6K contracts
- Events
- 1
- Markets
- 4
Current odds
Snapshot from
As of Nov 28, 2026, 12:00 PM UTC, the highest-priced outcome on Kalshi is Above 15 days at 16.5%.
Kalshi
- Above 15 days16.5%
- Above 30 days1.5%
- Above 25 days1.5%
- Above 20 days1.5%
Yes prices. They are not order quotes; check each platform's rules, fees and live prices before trading.
AI Analysis
Trader mode: Market mechanics, assumptions and risks
K 277.6K contracts
Reported volume · provider units
4
Saved contracts
0
Same-question pairs
Source snapshot: Nov 28, 2026, 12:00 PM UTC
This analysis was written from an earlier market snapshot, so its prices may be older than the odds above.
Snapshot observed Nov 27, 2026, 9:00 AM UTC. This analysis describes that snapshot and is not a live news update.
What the contract measures
This event asks how many calendar days in 2026 an RTO-wide PJM Maximum Generation Emergency/Load Management Alert, Capacity Emergency, NERC EEA 1 was applicable. Each market is a threshold question. For example, one listed market resolves to Yes if the count is "above 15 days" [1]. The source says a calendar day counts once if the procedure applied "for any portion of that day, regardless of how many separate postings were issued" [1]. Zone-only or region-only emergencies and drills do not count [1].
The source also gives a clarification dated 09/02/26. It states that PJM's Postings Report identified 11 eligible calendar days through September 2, and that "the current resolution value is 11 qualifying days" [1]. That clarification is part of the contract's own explanatory text, not a settled final count for the full year.
Reading the snapshot
The saved prices were observed at Nov 27, 2026, 9:00 AM UTC and retrieved at 11:22:54Z [1]. They describe that moment only and are not live quotes or verified probabilities. The four saved Kalshi markets show these Yes prices:
- Above 15 days: Yes 0.165, No 0.835
- Above 20 days: Yes 0.015, No 0.985
- Above 25 days: Yes 0.015, No 0.985
- Above 30 days: Yes 0.015, No 0.985 [1]
The four markets are all included in the saved sample, with no partial sampling flagged [1]. The reported volume of 277,623 contracts is Kalshi's own total for this event [1]. It is not a measure of liquidity or the number of traders.
The saved markets do not include an "Above 10 days" contract. The source's clarification says that market "will be determined Yes" based on the 11-day count, and that "the other strikes remain undetermined" [1]. This snapshot does not show a price for that contract, so it cannot be used to compare it with the others.
What remains uncertain
The source has a discrepancy about timing. The market records list an end date of Jan 1, 2027, 4:58 AM UTC, but the provider status line says the "Listed end time: not supplied" [1]. Treat the end date as a listed field and check the provider before relying on it.
The sample also covers only one provider event. No other platform's prices are included, so there is no basis for comparing or averaging across platforms. Differences in wording between contracts matter, since each threshold is a separate question. The snapshot does not explain why prices are where they are, and no supplied evidence covers recent news or past forecasting performance.
References
- Kalshi: How many PJM capacity emergency days will there be in 2026?. Provider data observed Nov 27, 2026, 9:00 AM UTC.
Snapshot observed Nov 25, 2026, 12:00 PM UTC. This analysis describes that snapshot and is not a live news update.
What the contract measures
The Kalshi event asks how many calendar days an RTO-wide PJM Maximum Generation Emergency/Load Management Alert, classified as a Capacity Emergency and NERC EEA 1, was applicable in 2026. The rules state that "If the number of calendar days on which an RTO-wide PJM Maximum Generation Emergency/Load Management Alert – Capacity Emergency – NERC EEA 1 was applicable in 2026 is above X days, then the market resolves to Yes" [1]. Several details matter for comparison. A day counts once even if several postings apply to it. Zone-only or region-only emergencies do not count, and drills are excluded [1]. The rules also say PJM's Postings Report counts an event on each date it applies, including events spanning multiple days [1].
Reading the snapshot
The saved prices were observed at Nov 25, 2026, 12:00 PM UTC and retrieved at 12:22:17Z. They are snapshots, not executable quotes or verified probabilities. For the four saved strikes, the Yes prices are 0.165 for above 15 days, and 0.015 for each of above 20, above 25, and above 30 days [1]. The contracts are separate thresholds on one count, so they are not independent bets and should not be read as a single distribution.
The event's clarification, dated 09/02/26, says the "current resolution value is 11 qualifying days" through September 2 and that the "Above 10 days" market "will be determined Yes" [1]. That is a dated statement in the excerpt, not a current count. The 10-day strike is not among the saved prices, so it is not interpreted here.
The four markets list an end date of Jan 1, 2027, 4:58 AM UTC, but the excerpt states "Listed end time: not supplied" [1]. The rules also reference a 2026 window, so readers should not treat the listed end date as a confirmed resolution time.
Volume is reported as "277,207 contracts" for this Kalshi event only [1]. It is not a measure of liquidity or trader count, and no Polymarket figure is included for comparison.
What remains uncertain
The sample includes all four saved markets for this event, with no partial sample flagged. That does not establish that every possible real-world threshold is listed. The evidence does not explain why prices are where they are, and it contains no information on how many participants hold each view. No resolution has been recorded in the supplied evidence beyond the dated clarification.
References
- Kalshi: How many PJM capacity emergency days will there be in 2026?. Provider data observed Nov 25, 2026, 12:00 PM UTC.
AI-generated analysis based on market data. Not financial advice.
Saved Nov 25, 2026 UTCThis article was written from an earlier market snapshot and may be out of date. Use the dated market data and provider rules above for current information.
Overview
The Kalshi event "How many PJM capacity emergency days will there be in 2026?" is a contract about how many calendar days in 2026 an RTO-wide PJM emergency alert was in effect. The contract is built around a specific PJM alert, described as a Maximum Generation Emergency/Load Management Alert at the Capacity Emergency level, which corresponds to NERC EEA 1 [1]. The rules count a calendar day once if the specified procedure applied during any part of that day, regardless of how many separate postings were issued [1]. The rules also say that only postings applying to the whole PJM region count. Emergencies limited to individual zones or regions do not, and drills are excluded [1]. The rules describe a threshold structure. A market resolves to Yes if the qualifying day count is above a chosen number X. The clarification dated 09/02/26 says PJM's Postings Report identified 11 eligible calendar days through September 2 [1]. That report listed 12 non-drill dates, but one date, May 20, was excluded because the alert applied only to BGE, DOM, and PEPCO rather than to PJM-RTO [1]. The same clarification states that the "Above 10 days" market would be determined Yes on that count, while the other strikes remained undetermined [1]. This clarification is an interim update tied to September 2, not a final count for the full year. The contract is therefore best understood as a running tally of a defined category of emergency days, with rules that decide which postings qualify. The listed end time for the provider event is not supplied in the evidence [1]. The listed end date for the four sampled threshold markets is January 1, 2027 at 04:58 UTC. That date is a platform field, not an announced event or confirmed resolution time.
Historical Context
The supplied sources include a Wikipedia article on the Northeast blackout of 2003, which describes a widespread power outage across parts of the Northeastern and Midwestern United States and most of the Canadian province of Ontario, beginning just after 4:10 p.m. EDT on Thursday, August 14, 2003 [2]. The evidence does not connect that event to the PJM alert rules or to this contract, so it provides only general regional background. No other historical record of PJM emergency days is supplied.
Why It Matters
The contract measures how often the most serious category of PJM grid alert is in effect over a calendar year. Because the rules count each calendar day once and exclude zone-only alerts and drills, the figure reflects regional, non-drill emergency postings only [1]. Traders following this event need to track the PJM Postings Report and the rule clarifications, since the count depends on how each posting is classified [1].
Snapshot context
The latest published provider snapshot for this topic was observed on 2026-11-25 at 12:00 UTC. It contains listings from Kalshi. Market descriptions and listed closing times define the contracts; they do not establish that the real-world outcome has occurred. This article does not include a separately verified news update. [1]
Frequently Asked Questions
What counts as a qualifying day?
A qualifying day is a calendar day on which an RTO-wide PJM Maximum Generation Emergency/Load Management Alert at the Capacity Emergency level, corresponding to NERC EEA 1, was applicable. A day counts once even if the procedure applied for only part of it or if several postings were issued [1].
Do zone-only emergencies count?
No. Emergencies limited to individual zones or regions do not count under the rules [1]. The September 2 clarification excluded a May 20 date for this reason, because the alert applied only to BGE, DOM, and PEPCO [1].
Do drills count?
No. The rules exclude drills, and the clarification also excludes them from the count [1].
Does an alert that spans several days count for each day?
The rules say PJM's Postings Report counts an event on each date for which it applies, including events that cover multiple calendar days [1].
What was the count in the clarification?
The clarification identified 11 eligible calendar days through September 2, and it stated that the "Above 10 days" market would be determined Yes on that count. The other strikes were described as undetermined at that time [1].
Does the sampled market data show the full set of outcomes?
The sample includes four threshold markets for this event, at 15, 20, 25 and 30 days. The "Above 10 days" market mentioned in the clarification is not among the sampled markets. The listed prices are provider snapshots at the observation time, not executable quotes or verified probabilities [1].
AI-written background. References identify the evidence used; Wikipedia links under Learn More are additional reading. Prices and provider rules are dated snapshots. This is not financial advice.
Related prediction markets
Prices are catalog snapshots and may have changed. Check each market's rules and observation time.

Fed rate cut by...?
PM $81.48M · K 34.39M contractsAnother Fed rate hike in 2026?
Kalshi: Will the Federal Funds Rate Decision be 25bp hike AND dissents be 0 for Dec 2026?
Related contracts
Another Fed rate hike in 2026?
Kalshi: Will the Federal Reserve Hike rates by 25bps at their December 2026 meeting?
Related contracts
Another Fed rate hike in 2026?
Kalshi: Will the Federal Reserve hike rates by December 31, 2026?
Related contracts
Related or unreviewed contracts may settle differently. Their gap is not an equivalent-contract comparison.
Saved prices; check contract rules.

Measles cases in U.S. in 2026?
PM $8.47M · K 473.0K contractsWill there be at least 7000 measles cases in the U.S. in 2026?
Kalshi: Will there be more than 7000 measles cases in 2026?
Related contracts
Will there be at least 7500 measles cases in the U.S. in 2026?
Kalshi: Will there be more than 7500 measles cases in 2026?
Related contracts
Will there be at least 8000 measles cases in the U.S. in 2026?
Kalshi: Will there be more than 8000 measles cases in 2026?
Related contracts
Related or unreviewed contracts may settle differently. Their gap is not an equivalent-contract comparison.
Saved prices; check contract rules.

2026 Midterms: U.S. House turnout?
K 686.3K contracts
Traffic through the Suez Canal? (11/23 - 11/29)
K 212.4K contracts
Traffic through the Panama Canal? (11/23 - 11/29)
K 81.3K contracts
Traffic through the Suez Canal? (11/30 - 12/6)
K 37.5K contractsMarket Insights
Price gaps of 2 pp+
0
Same-question pairs
0
No outcomes on this page have been reviewed as the same question on both platforms yet.
Price differences do not establish arbitrage. Check each pair's review, current order prices, fees and settlement rules.
