Skip to main content
Market snapshot: . Prices may have changed since this snapshot.
Events
GroupKALSHI
US private data center construction spending in October
US private data center construction spending in October
Reported volume
K 423.2 contracts
Events
1
Markets
11

Current odds

Snapshot from

As of Nov 22, 2026, 12:00 PM UTC, the highest-priced outcome on Kalshi is Above $90.0B at 96.5%.

Kalshi

  1. Above $90.0B96.5%
  2. Above $92.5B95.5%
  3. Above $95.0B93.5%
  4. Above $97.5B89.5%
  5. Above $100.0B83.5%

Yes prices. They are not order quotes; check each platform's rules, fees and live prices before trading.

AI Analysis

Trader mode: Market mechanics, assumptions and risks

K 423.2 contracts

Reported volume · provider units

11

Saved contracts

0

Same-question pairs

Source snapshot: Nov 22, 2026, 12:00 PM UTC

This analysis was written from an earlier market snapshot, so its prices may be older than the odds above.

Snapshot observed Nov 21, 2026, 12:00 AM UTC. This analysis describes that snapshot and is not a live news update.

What the contract measures

The Kalshi event asks whether the first published U.S. Census Bureau estimate of U.S. private data center construction spending for October 2026 will be above a stated threshold. The figure is found under "Private → Nonresidential → Office → Data center" and is reported in millions of dollars at a seasonally adjusted annual rate, so "$70 billion corresponds to $70,000 million" [1]. The rules state that "The first figure published for the relevant month will be used, including if Census identifies that figure as preliminary," and that "Subsequent revisions, corrections, or updated estimates will not affect the market's resolution" [1].

The source excerpt says the market "will close and expire early if the economic data is released" [1]. It also lists the end time as "not supplied" [1], while the market records show an end date of Dec 1, 2026, 2:59 PM UTC [1]. Treat that value as the recorded close time for these contracts. It is not an announced Census release date, and the evidence does not supply one.

Reading the snapshot

The snapshot was observed at Nov 21, 2026, 12:00 AM UTC and retrieved at Nov 21, 2026, 1:07 AM UTC [1]. These are the times of the saved data, not confirmation of current prices.

The eleven contracts range from a Yes price of 0.965 at the "above $90.0B" threshold to 0.105 at "above $115.0B" [1]. Yes prices decline as thresholds rise. The "above $107.5B" contract is priced at 0.495 Yes and 0.505 No [1]. Each threshold is a separate contract, so the prices should be read individually rather than combined. These are snapshot prices, not executable quotes or verified probabilities.

All eleven saved markets for this provider event are included, and the sample is not marked partial [1]. Kalshi reports 423 contracts of volume for the event [1]. That figure is in the provider's own units and does not indicate liquidity or the number of traders. Only one provider appears here, so no cross-platform comparison applies.

What remains uncertain

The evidence does not explain why prices sit where they do, and it contains no news, trader counts, or views on the likely Census figure. It does not report the actual October 2026 estimate, and it gives no release date beyond the early-close clause. The sample covers this saved Kalshi event only and does not establish that the provider lists every possible outcome. Differences between threshold prices reflect different contracts and do not, on their own, identify an opportunity.

References

  1. Kalshi: US private data center construction spending in October. Provider data observed Nov 21, 2026, 12:00 AM UTC.

AI-generated analysis based on market data. Not financial advice.

Saved Nov 21, 2026 UTC

This article was written from an earlier market snapshot and may be out of date. Use the dated market data and provider rules above for current information.

Overview

This market asks whether the U.S. Census Bureau's first published estimate of U.S. private data center construction spending for October 2026 will be above a stated threshold. The contract rules say the figure is taken from the Census Bureau's Value of Private Construction Put in Place series, seasonally adjusted annual rate, under the Private, Nonresidential, Office, and Data center line [1]. The estimate is reported in millions of dollars at an annual rate, so a threshold written in billions must be converted. The rules give $70 billion as an example of 70,000 million [1]. The rules say the first published figure is used even if Census labels it preliminary. Later revisions, corrections, or updated estimates do not change the resolution [1]. The rules also state that the market will close and expire early if the economic data is released [1]. The provider's listed end date is a separate field and should not be read as a scheduled release date. The subject matter is data center construction, a category of building activity. Wikipedia describes a data center as a facility that houses computer equipment for storing, processing, and transmitting digital information, typically including servers, storage devices, networking equipment, electricity distribution, cooling systems, and security measures [3]. It describes an AI data center as a specialized version designed for training and running artificial intelligence and machine learning models, often using AI accelerators and high-speed interconnects [2]. These general definitions help explain the category, but the contract itself depends on the Census figure and not on these definitions [1].

Why It Matters

The contract measures a single official statistic: the first published Census Bureau estimate of U.S. private data center construction spending for October 2026, expressed at a seasonally adjusted annual rate [1]. Each listed contract asks whether that figure will exceed a different dollar threshold, ranging from $90.0 billion to $115.0 billion in the saved sample [1]. Because the outcome depends on one published figure, the contract's wording on which estimate counts is central. Revisions published later do not change the result under the stated rules [1]. The prices shown in the market data are snapshots from the observation time, not executable quotes or verified probabilities. They describe trading activity in the provider's market at that moment and should not be treated as an official forecast of the Census figure.

Snapshot context

The latest published provider snapshot for this topic was observed on 2026-11-14 at 12:00 UTC. It contains listings from Kalshi. Market descriptions and listed closing times define the contracts; they do not establish that the real-world outcome has occurred. This article does not include a separately verified news update. [1]

Frequently Asked Questions

What number decides whether the market resolves Yes?

The market resolves based on the first published estimate of U.S. private data center construction spending for October 2026 reported by the U.S. Census Bureau, in millions of dollars at a seasonally adjusted annual rate [1].

What happens if the Census Bureau revises the figure later?

The rules say the first published figure is used, including when Census labels it preliminary, and that subsequent revisions, corrections, or updated estimates will not affect resolution [1].

How do I read a threshold such as $90.0B?

The rules say Census reports the figure in millions of dollars, so a threshold in billions must be multiplied by 1,000 to compare it. For example, $70 billion corresponds to $70,000 million [1].

Does the listed end date mean the data will be released then?

The rules state that the market will close and expire early if the economic data is released [1]. The provider's end date field is listed separately and should not be read as a confirmed release date.

What is data center construction in this context?

Wikipedia describes a data center as a facility for housing computer equipment used to store, manipulate, and transmit digital information [3]. The contract's measure is the Census Bureau's construction spending category for data centers [1].

Was this helpful?
Saved Nov 14, 2026 UTC

AI-written background. References identify the evidence used; Wikipedia links under Learn More are additional reading. Prices and provider rules are dated snapshots. This is not financial advice.

Prices are catalog snapshots and may have changed. Check each market's rules and observation time.

KalshiPolitics
US manufacturing construction spending in December 2026

US manufacturing construction spending in December 2026

K 4.3K contracts
Will Total Construction Spending: Manufacturing in the United States for December 2026 be above $130 billion?Yes 97%
Will Total Construction Spending: Manufacturing in the United States for December 2026 be above $140 billion?Yes 97%
Will Total Construction Spending: Manufacturing in the United States for December 2026 be above $150 billion?Yes 96.5%
+7 moreNext deadline Feb 1, 2027 UTC
KalshiPolitics
Which states will enact data center moratoriums before 2028?

Which states will enact data center moratoriums before 2028?

K 3.7K contracts
Will Maine enact a data center moratorium before 2028?Yes 80.5%
Will New Mexico enact a data center moratorium before 2028?Yes 70.5%
Will New Hampshire enact a data center moratorium before 2028?Yes 58.5%
+44 moreNext deadline Jan 1, 2028 UTC
KalshiEconomics
Americas data center capacity at the end of 2026

Americas data center capacity at the end of 2026

K 1.6K contracts
Will Americas operational data center capacity for 2026 be above 45.0 GW?Yes 97%
Will Americas operational data center capacity for 2026 be above 47.5 GW?Yes 96.5%
Will Americas operational data center capacity for 2026 be above 50.0 GW?Yes 93.5%
+6 moreNext deadline Mar 5, 2027 UTC
KalshiEconomics
US new home · Sales in October

US new home · Sales in October

K 12.5K contracts
Will US new home sales for October 2026 be above 600,000?Yes 82%
Will US new home sales for October 2026 be above 620,000?Yes 70.5%
Will US new home sales for October 2026 be above 640,000?Yes 48.5%
+5 moreNext deadline Nov 25, 2026 UTC
KalshiWorld
Loudoun Water data center potable water use in Q1 2027

Loudoun Water data center potable water use in Q1 2027

K 295.13 contracts
Will Loudoun Water data center potable water use for Q1 2027 be above 150 million gallons?Yes 90.5%
Will Loudoun Water data center potable water use for Q1 2027 be above 200 million gallons?Yes 81%
Will Loudoun Water data center potable water use for Q1 2027 be above 250 million gallons?Yes 51.5%
+4 moreNext deadline Oct 1, 2028 UTC
KalshiPolitics
How many states will adopt data center moratoriums in 2026?

How many states will adopt data center moratoriums in 2026?

K 18.8K contracts
Will the number of U.S. states that formally adopt a binding state-level moratorium on data-center development be at least 4 in 2026?Yes 54.5%
Will the number of U.S. states that formally adopt a binding state-level moratorium on data-center development be at least 5 in 2026?Yes 36.5%
Will the number of U.S. states that formally adopt a binding state-level moratorium on data-center development be at least 6 in 2026?Yes 7.5%
+2 moreNext deadline Jan 1, 2027 UTC

Market Insights

Price gaps of 2 pp+

0

Same-question pairs

0

No outcomes on this page have been reviewed as the same question on both platforms yet.

Price differences do not establish arbitrage. Check each pair's review, current order prices, fees and settlement rules.

Trade This Market